A network of expressways is being laid continuously in Uttar Pradesh. The state has been blessed with many expressways from Bundelkhand Expressway to Purvanchal Expressway. At the same time, work is going on at a fast pace on many other expressways including Ganga Expressway.
Gorakhpur-Shamli Greenfield Expressway
There is a plan to build a greenfield expressway from Gorakhpur to Shamli. This expressway will connect Purvanchal with western UP. It is expected that its construction work can also start by the end of this year.
what length
The length of the Greenfield Expressway from Gorakhpur to Shamli will be about 700 kilometers. It will be called the second largest expressway of UP.
Journey from Purvanchal to Western Uttar Pradesh
Construction of Greenfield Expressway from Gorakhpur to Shamli will make it easier to reach from Western Uttar Pradesh to Eastern Uttar Pradesh. A large section of the society will benefit from the construction of this expressway.
It will pass through 22 districts
The expressway will pass through 22 districts of UP namely Sant Kabir Nagar, Basti, Ayodhya, Barabanki, Gonda, Bahraich, Lucknow, Sitapur, Hardoi, Shahjahanpur, Badaun, Bareilly, Rampur, Moradabad, Sambhal, Amroha, Bijnor, Meerut, Muzaffarnagar and others. Saharanpur.
preparation of dpr
According to media reports, preparations are underway to prepare the DPR of this expressway. Its map will be revealed after it is finalized.
vehicle speed will increase
This Greenfield Expressway will also help in increasing the speed of vehicles in Uttar Pradesh and will also improve the connectivity of the state.
Preparations to land fighter planes
There is a plan to develop a facility to land fighter aircraft on the expressway like Agra-Lucknow Expressway and Purvanchal Expressway, so that aircraft can be landed here in case of emergency.
an airstrip will be built
Gorakhpur-Shamli Expressway will pass near the border of India and Nepal. This will also boost road connectivity. An airstrip will also be built on the expressway. It will be used to deal with the challenges coming from China through Nepal.
distance will decrease
Currently the journey between Gorakhpur and Shamli takes about 15 hours, but now this journey will reduce to just 8 hours.
Where will it start?
According to NHAI officials, this expressway will start from Gogwan Jalalpur. If reports are to be believed, construction of the expressway may start by the end of this year. It is estimated to cost Rs 35,000 crore to build it.
Disclaimer
The information given in the article has been collected from common sources. We are not responsible for its authenticity. GUPUK does not claim or confirm that the fictional depiction of AI is exactly that.