Giving new direction to traffic and connectivity between Uttar Pradesh and Delhi Ganga Expressway Has reached its final stage fast. This project not only 12 districts of Uttar Pradesh and 518 villages Connects, but rather Delhi Traffic and pollution Will also help in reducing the problem of. This one Greenfield Expressway Is, which is considered one of the largest road development projects in India.
Major information of Ganga Expressway:
-
Length: 594 km
-
Total cost: ₹ 36,230 Crore
-
Coverage: 12 districts of UP and 518 villages
-
beginning: Bijouli village, Meerut-Bulandshahr Highway
-
Ending: Judapur Dadu Village, Prayagraj (NH-19)
Expressway will pass through 12 districts:
-
Meerut
-
Hapur
-
Bulandshahr
-
Amroha
-
Sambhal
-
Badaun
-
Shahjahanpur
-
Hardoi
-
Unnao
-
Rae Bareli
-
Pratapgarh
-
Prayagraj
90% construction work completed
Ganga Expressway 90 percent work completed It is done and it is expected that it will be opened for traffic soon. Many important infrastructural aspects have also been added to the construction, such as Steel girder on railway line near Sonic station The work of planting is in the final stages.
Speed and Structure:
-
Maximum speed limit: 120 km per hour
-
7467 hectares Land construction
-
currently 6 lanesIn the future 8 lanes Plan to expand up to
-
126 small bridges, 381 underpasses, 28 flyover Are made
Security and Facilities:
-
Public facility campus at 9 places Will be developed
-
Prayagraj and Meerut Main toll plaza in
-
Ramp toll plaza at 15 places
-
3.5 km long airstrip in ShahjahanpurWhere in emergency Fighter jet and helicopter Will be able to take off
IPL 2025: Dasun Shanaka’s entry in Gujarat Titans, team’s strength doubled
The Post Ganga Expressway: Game Changer Project for UP and Delhi, 90% Construction Complete appeared on News India Live | Breaking India News, The Indian Headline, India Express News, Fast India News.