Noida is a great news for the residents! A plan to build a 5.5 km long elevated road to get rid of the problem of traffic jam in a very busy and crowded area of the city has got the green signal. With the creation of this elevated road, not only will traffic be easy, but the travel time will also be reduced significantly. According to the information, the journey which is decided in 30 minutes will be completed in just 10 minutes after the construction of this road.
How much will the cost of the project be?
This ambitious elevated road project is estimated to cost around Rs 700 crore. It is an important infrastructure project approved by Noida Authority, which has been designed with the aim of improving the city’s traffic management and relieving people from jam.
IIT Roorkee gets a big responsibility
The important responsibility of preparing the feasibility report (feasibility report) and detail project report (DPR) of this important project has been entrusted to the country’s prestigious educational institution IIT Roorkee. This is the first time the Noida Authority has chosen a well -known educational institution as a consultant, which will work on various technical aspects from the outline of the entire project. This step is an important effort to ensure the quality and reliability of the project.
Where will this elevated road be built and what will be the benefits?
It will be built from Sector-3 of Elevated Road Noida to Sector-57. After this, the drivers will not have to stop repeatedly on traffic signals. They will be able to travel their journey straight and without any hindrance, which will make traffic from Sector-3 to Sector-57 to a great extent. This will not only save the precious time of the people, but will also save fuel and also reduce the level of pollution, which is also a good news for the city’s environment.
What are the current traffic problems?
Currently, there are five major red lights (traffic signals) like Rajnigandha intersection, Sector-10 intersection, Sector-12 wide turn and Sector-57 intersection on this route. Thousands of drivers pass through these intersections daily, and there is often heavy traffic jam situation here. Due to this jam, people have to be trapped for 30 minutes or more, which causes them a lot of trouble.
DND will get direct contact, Delhi-Noida connectivity will be strong
Another major advantage of this elevated road will be that passengers coming through DND flyway from South Delhi will now be able to reach Sector-57 directly without any obstruction. They will not have to pass through the internal areas of the city. This will not only reduce traffic pressure in the interiors of Noida, but people traveling between Delhi and Noida will also benefit greatly and connectivity between the two cities will be stronger.
Noida Authority received theoretical approval
It is a matter of happiness that the Chief Executive Officer (CEO) of Noida Authority has given its in -principle approval to this important project. The responsibility of completing this work has been entrusted to the work Circle-1 of Noida Authority. This approval is a huge step towards the implementation of the project and it indicates that the authority is committed to pursue the scheme seriously and rapidly. It is expected that the ground work on this project will start soon.