Central Railway, Mumbai Division will operate Mega Block on its suburban sections to carry out various engineering and maintenance works on 23rd March on Sunday.
Matunga-Mulund UP and DN fast lines from 11.30 am to 3.30 pm
DN fast line services leaving CSMT Mumbai from 10.58 am to 3.10 pm will be diverted on DN slow line at Matunga station halting as per their respective halts between Matunga and Mulund stations and will arrive destination 15 minutes behind schedule.
Fast trains beyond Thane will be re-diverted on DN fast line at Mulund station
UP fast line services leaving Thane from 11.25 am to 3.27 pm will be diverted on UP slow line at Mulund station, halting as per their respective halts between between Mulund and Matunga stations and will be re-diverted on UP fast line at Matunga station and will arrive destination 15 minutes behind schedule
UP & DN Harbour lines between Kurla and Vashi from 11.10 am to 4.10 pm
DOWN Harbour line services to Vashi /Belapur/Panvel departing CSMT from 10.34 am to 3.36 pm and UP Harbour line services for CSMT departing Panvel/Belapur/Vashi from 10.16 am to 3.47 pm will remain cancelled.
However, Special services will run between CSMT-Kurla and Kurla – Panvel/Vashi during the block period.
Harbour line passengers are permitted to travel via Thane-Vashi / Nerul stations from 10.00 am to 6.00 pm
These maintenance mega blocks are essential for infrastructure upkeep and safety. Passengers are requested to bear with the Railway Administration for the inconvenience caused.